The project, the details of which are given below, in a 6-storey building on Timko Street, Argeme campus;
-2nd FLOOR : Mechanical Manufacturing, Mechanical Test and Assembly floor,
-1st FLOOR : Company storage and Semi-Product Area (barcode tracking system) floor,
ENTRANCE FLOOR: Electronic Manufacturing, Electronic Test Center and the working floor of our Electrical-Electronic Engineers,
1st FLOOR : Working floor of our Industrial Engineers, Manufacturing Tracking, Lean and Digital Transformation floor,
2nd FLOOR : Mechanical Design and Embedded Software floor,
3rd FLOOR : Software and Image Processing floor
Ostim Technical University Protada Project group is located.